Case study · Measure

Measure: from drawings to a priced bill

Measure reads an architect's drawing set and builds the Bill of Quantities, with every line tied back to the drawing it came from.

The problem

A bill of quantities is still built by hand

A Bill of Quantities, or BOQ, is the list of everything a building needs, measured and priced. Cost consultants and contractors build it by reading the architect's drawings and typing the results into Excel. It works, but it is slow, and it breaks in the same four places every time.

How it works

Four steps, from sheets to a bill

Watch one drawing set travel through Measure. Pick a step to jump to it.

Measure

Priced bill, tender bill, review link

Open questions go out as clarifications. A person rules on each one.

Drawing files and PDFs
Registered sheet by sheet
Finish hatches lit
Not in contract
Ceiling, still counted
Measured
Counted
Provisional
Priced bill
Tender bill, rates blank
Review link
Clarification, ticked by a person
  1. Reading the drawing set. Sheets arrive together and are registered one by one.
  2. Scope from the hatches, not the room labels. The grey area outside the contract is taken away. A ceiling with no hatch is still a finish.
  3. Every line points to its drawing. Each row is measured, counted or provisional, and says so.
  4. Priced bill, tender bill, review link. Open questions go out as clarifications. A person rules on each one.
  • Receive

    Reading the drawing setSheets arrive together and are registered one by one.
  • Read

    Scope from the hatches, not the room labelsThe grey area outside the contract is taken away. A ceiling with no hatch is still a finish.
  • Measure

    Every line points to its drawingEach row is measured, counted or provisional, and says so.
  • Deliver

    Priced bill, tender bill, review linkOpen questions go out as clarifications. A person rules on each one.

What a person still decides

The software raises the doubt. A person rules on it.

Drawings often disagree with each other: a plan shows one thing, a section shows another. Measure does not pick a side quietly. It raises a clarification, says which sheets conflict, and waits.

The cost consultant rules on every clarification. Their answer is recorded, and the affected lines update.

When the architect sends mark-ups, they fold back into the same model. Only the changed lines move, and a new revision is rebuilt the same day, with the differences listed.

Nothing is hidden inside a total. Each figure can be opened and checked.

Where it is used

Teams that live on drawings

Next

Bring a drawing set and see a bill

A short call is enough to see whether Measure fits how your team prices work.

More case studies